HRSG modifications to increase back pressure capability and MW output at McIntosh CCGT
Presented by Harold Snyder, PE, Lakeland Electric.
The Importance of HRSG HP Evaporator Deposits in Influencing Tube Failures
Presented by Barry Dooley, Structural Integrity Associates, bdooley@structint.com.
So, I Need to Chemically Clean my HRSG
Presented by Douglas Hubbard, American Electric Power (ret.), dehubbard77@gmail.com.
Why Failure Analysis is Performed
Presented by Albert Olszewski, Principal Engineer, Constellation Energy
HRH Bypass Cracking: Case Study in Repair and Mitigation
Presented by Diederic Godin, P.E., Capital Power and Ory Selzer, IMI CCI
NDE, Welding and Metallurgy: Tools Supporting the Safe, Efficient Operation of Aging HEP
Presented by Jeff Henry, President, ATC-CES Inc.
Casting the Die - Implications of Zinc for Pressure Part Integrity
Presented by Paul James, Materials & Corrosion Team, Uniper Technologies Ltd
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.